PROJECT · R-001 · 2024

STEALTH TUBING.

Fully hidden hardline routing inside a HYTE Y70.

STEALTH TUBING
R-001 · HERO STUDY · MODDING CAFE ARCHIVE
86BUILD HOURS
26TUBE BENDS
04EPISODES
−24°THERMAL DELTA
01 · STORY

THE BRIEF.

A case study in space constraints and precision.

02 · FAILURE

THE CHALLENGE.

Tight space made every error visible behind glass.

03 · NOTES

ENGINEERING NOTES.

The backplate was measured, milled and pressure-tested.

04 · RESULT

THE FINAL SYSTEM.

A clean, serviceable loop with stable thermals.

05 · SPEC SHEET

THE HARD NUMBERS.

CHASSIS
HYTE PLATFORM
COOLING
CUSTOM HARDLINE LOOP
MATERIAL
BRASS · ACRYLIC · ALUMINIUM
YEAR
2024
STATUS
ARCHIVED · DOCUMENTED
06 · RELATED

KEEP READING.