PROJECT · R-001 · 2024
STEALTH TUBING.
Fully hidden hardline routing inside a HYTE Y70.

R-001 · HERO STUDY · MODDING CAFE ARCHIVE
86BUILD HOURS
26TUBE BENDS
04EPISODES
−24°THERMAL DELTA
01 · STORY
THE BRIEF.
A case study in space constraints and precision.
02 · FAILURE
THE CHALLENGE.
Tight space made every error visible behind glass.
03 · NOTES
ENGINEERING NOTES.
The backplate was measured, milled and pressure-tested.
04 · RESULT
THE FINAL SYSTEM.
A clean, serviceable loop with stable thermals.
05 · SPEC SHEET
THE HARD NUMBERS.
- CHASSIS
- HYTE PLATFORM
- COOLING
- CUSTOM HARDLINE LOOP
- MATERIAL
- BRASS · ACRYLIC · ALUMINIUM
- YEAR
- 2024
- STATUS
- ARCHIVED · DOCUMENTED
06 · RELATED